SOULCALIBUR VI - DLC7: Hilde

BANDAI NAMCO ENTERTAINMENT EUROPE
PS4
Average rating 4.65 stars out of 5 stars from 230 ratings
Violence
  • PS Plus required for online play
  • Supports up to 8 online players with PS Plus
  • Online play optional
  • 1 - 2 players
  • Remote Play supported
Violence

Ratings

Global player ratings

Average rating 4.65 stars out of 5 stars from 230 ratings
230 ratings

Purchasing this add-on unlocks Hilde as a playable character in the main game of SOULCALIBUR VI, as well as an exclusive story for Hilde in Soul Chronicle.

The first character to join the fray as part of Season Pass 2 is none other than Hilde, the 'Princess General'!
Overpower opponents with her spear and sword, and claim victory using her 'Regal Arts', special techniques of the royal family!

DLC Content:
- Hilde as a playable character
- Additional story of Hilde in 'STORY: Soul Chronicle'
- Additional items for use in Character Creation (11 total)
- Additional weapons (7 total)
- Additional titles (4 total)
- Additional battle comments (2 total)

1-2 players
Network Players 2-8 - Full game requires PlayStation®Plus membership to access online multiplayer
11GB minimum save size
Remote Play Supported
HD Video Output 720p,1080i,1080p

Download of this product is subject to the PlayStation Network Terms of Service and our Software Usage Terms plus any specific additional conditions applying to this product. If you do not wish to accept these terms, do not download this product. See Terms of Service for more important information.
One-time licence fee to download to multiple PS4 systems. Sign in to PlayStation Network is not required to use this on your primary PS4, but is required for use on other PS4 systems.
See Health Warnings for important health information before using this product.
Library programs ©Sony Interactive Entertainment Inc. exclusively licensed to Sony Interactive Entertainment Europe. Software Usage Terms apply, See eu.playstation.com/legal for full usage rights.

SOULCALIBUR™Ⅵ & ©2018 BANDAI NAMCO Entertainment Inc.

Platform:
PS4
Release:
26/11/2019
Publisher:
BANDAI NAMCO ENTERTAINMENT EUROPE
Genres:
Fighting